ESP to FF Conversion
100ESP_FF sideCFDsm

CFD of ESP to FF conversion is carried out prior to replacement FF design

100Ciments Calcia2

Original ESP prior to conversion

ESPFF1

Removal of existing ESP

ESPFF2

Old ESP and new FF sitting side-by-side

ESPFF3

New FF being lifted shows pre-installed gas distribution device and SS clean gas plenum

ESPFF4

New FF being lifted in preparation of replacement

ESPFF5

New FF being set down onto existing structural steel and hoppers

ESPFF6

New FF after completion of installation - 1 week later

pjff cage install med

Inside of long bag ESP to FF Conversion - 8 meter long bags

pjff header med

Pulse header with Vento Controller

pjff long bags int med

View of 8 meter long bags from inside dirty gas plenum

esp_ff china med

View or new clean gas plenums on power boiler ESP to FF retrofit