CFD of ESP to FF conversion is carried out prior to replacement FF design
Original ESP prior to conversion
Removal of existing ESP
Old ESP and new FF sitting side-by-side
New FF being lifted shows pre-installed gas distribution device and SS clean gas plenum
New FF being lifted in preparation of replacement
New FF being set down onto existing structural steel and hoppers
New FF after completion of installation - 1 week later
Inside of long bag ESP to FF Conversion - 8 meter long bags
Pulse header with Vento Controller
View of 8 meter long bags from inside dirty gas plenum
View or new clean gas plenums on power boiler ESP to FF retrofit